blog

/uploads/blog/pic-blog-11.jpg

Summary:

Cooling System:In Core : Baffle or By pass cooling ;In Cavity Plate: Chain drilling type cooling Surface Finish: Up to the product’s requirement, Normal used : Texture, EDM machining , Polishing Mold Life: Up to mold steel grade, under ideal o

  • Views:

Details:

Cooling System:In Core : Baffle or By pass cooling ;In Cavity Plate: Chain drilling type cooling
Surface Finish: Up to the product’s requirement, Normal used : Texture, EDM machining , Polishing
Mold Life: Up to mold steel grade, under ideal operation condition, 1. Pre-harden steel, min. 20~300000 shots 2. Harden / heat treatment steel : 60~800000 shots. 3. Stainless steel : 1 million shots.
Runner: 1. Cold runner 2. Hot runner 3.cold runner +hot runner
Delivery time: 80~90 days , presenting T1 samples
Packing: Standard Wooden Case
Production: We can also provide Pilot Run production and molding production